Skip to main content

米国で取引するにはpolymarket.us

icon for 10月1日までに送電網の緊急事態が発生することはありますか?

10月1日までに送電網の緊急事態が発生することはありますか?

icon for 10月1日までに送電網の緊急事態が発生することはありますか?

10月1日までに送電網の緊急事態が発生することはありますか?

$24,031 Vol.

2026/10/02
Polymarket

$24,031 Vol.

Polymarket

カリフォルニア(CAISO)

$3,356 Vol.

3%

テキサス(ERCOT)

$2,282 Vol.

6%

米国中部(SPP)

$945 Vol.

32%

中部大西洋地域(PJM)

$1,762 Vol.

1%

ニューヨーク(NYISO)

$1,890 Vol.

6%

ニューイングランド(ISO-NE)

$802 Vol.

3%

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".**Recent heat waves have tested major grids like PJM and MISO, prompting DOE emergency orders for backup generation as peak demand approached records amid high temperatures above 90°F in key areas.** Structural factors driving ongoing tightness include rapid load growth from data centers and manufacturing—pushing national electricity sales up nearly 2% this year per EIA—while resource additions lag in regions such as PJM, where reserve margins can drop sharply under stress. NERC’s 2026 Summer Reliability Assessment noted adequate supplies for normal conditions but elevated shortfall risks during extreme weather or low renewable output, with only three areas flagged at higher risk. Transformer supply constraints, worsened by recent bulk-power equipment restrictions, add vulnerability. With hurricane season still active and fall demand patterns emerging, traders are watching for any late-September weather shifts or updated NERC/EIA data that could tip marginal systems into emergency alerts before October 1.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".
音量
$24,031
終了日
2026/10/02
マーケット開始日
Aug 12, 2026, 5:25 PM ET

リゾルバー

0x65070BE91...
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".**Recent heat waves have tested major grids like PJM and MISO, prompting DOE emergency orders for backup generation as peak demand approached records amid high temperatures above 90°F in key areas.** Structural factors driving ongoing tightness include rapid load growth from data centers and manufacturing—pushing national electricity sales up nearly 2% this year per EIA—while resource additions lag in regions such as PJM, where reserve margins can drop sharply under stress. NERC’s 2026 Summer Reliability Assessment noted adequate supplies for normal conditions but elevated shortfall risks during extreme weather or low renewable output, with only three areas flagged at higher risk. Transformer supply constraints, worsened by recent bulk-power equipment restrictions, add vulnerability. With hurricane season still active and fall demand patterns emerging, traders are watching for any late-September weather shifts or updated NERC/EIA data that could tip marginal systems into emergency alerts before October 1.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".
音量
$24,031
終了日
2026/10/02
マーケット開始日
Aug 12, 2026, 5:25 PM ET

リゾルバー

0x65070BE91...

外部リンクに注意してください。

よくある質問

「10月1日までに送電網の緊急事態が発生することはありますか?」はPolymarket上の7個の結果が可能な予測市場で、トレーダーが何が起こるかに基づいてシェアを売買します。現在のリード結果は「中西部(MISO)」で100%、次いで「米国中部(SPP)」が32%です。価格はコミュニティのリアルタイム確率を反映しています。例えば、100¢で取引されているシェアは、市場がその結果に100%の確率を集合的に割り当てていることを意味します。これらのオッズは継続的に変化します。正しい結果のシェアは市場決済時に各$1で引き換え可能です。

本日現在、「10月1日までに送電網の緊急事態が発生することはありますか?」は$24Kの総取引量を生み出しています(Aug 12, 2026のマーケット開始以来)。この取引活動レベルはPolymarketコミュニティの強い関与を反映し、現在のオッズが幅広い市場参加者によって形成されていることを保証します。このページで直接、ライブの価格変動を追跡し、任意の結果で取引できます。

「10月1日までに送電網の緊急事態が発生することはありますか?」で取引するには、このページに記載されている7個の利用可能な結果を閲覧します。各結果には市場の暗示確率を表す現在の価格が表示されています。ポジションを取るには、最も可能性が高いと思う結果を選び、「はい」で支持するか「いいえ」で反対するかを選択し、金額を入力して「取引」をクリックします。選んだ結果が市場決済時に正しければ、「はい」のシェアは各$1を支払います。正しくなければ$0です。決済前にいつでもシェアを売却できます。

「10月1日までに送電網の緊急事態が発生することはありますか?」の現在のフロントランナーは「中西部(MISO)」で100%であり、市場がこの結果に100%の確率を割り当てていることを意味します。次に近い結果は「米国中部(SPP)」で32%です。これらのオッズはトレーダーがシェアを売買するにつれてリアルタイムで更新されます。頻繁に確認するか、このページをブックマークしてください。

「10月1日までに送電網の緊急事態が発生することはありますか?」の決済ルールは、各結果が勝者と宣言されるために何が起こる必要があるかを正確に定義しています。これには結果を決定するために使用される公式データソースも含まれます。このページのコメント上にある「ルール」セクションで完全な決済基準を確認できます。取引前にルールを注意深く読むことをお勧めします。