**H200 rental prices currently show median on-demand rates near $4.47 per GPU-hour across dozens of providers, with verified lows around $2.00–$3.00 on marketplaces like Vast.ai and spot options significantly cheaper.** This reflects sustained demand for the Hopper GPU’s 141 GB HBM3e memory and 4.8 TB/s bandwidth, which suits memory-bound LLM inference and training workloads better than the prior H100 generation. Supply remains constrained relative to hyperscaler and neocloud demand, though NVIDIA is shifting production emphasis toward Blackwell (B200/GB200) chips that now account for the majority of high-end shipments. Limited H200 exports to China and competition from newer platforms with native FP4 support and higher throughput create upward pressure on H200 utilization but also set the stage for potential softening later in 2026 as Blackwell capacity scales. Key near-term catalysts include further Blackwell ramp data, enterprise contract renewals, and any shifts in data-center power availability or export policy.
Ringkasan eksperimental yang dihasilkan AI dengan referensi data Polymarket. Ini bukan saran trading dan tidak berperan dalam bagaimana pasar ini diselesaikan. · Diperbarui$14,449 Vol.
↑ $7.00
40%
↑ $6.00
47%
↓ $4.00
65%
↓ $3.75
51%
↓ $3.50
64%
↓ $3.00
54%
↓ $2.50
11%
$14,449 Vol.
↑ $7.00
40%
↑ $6.00
47%
↓ $4.00
65%
↓ $3.75
51%
↓ $3.50
64%
↓ $3.00
54%
↓ $2.50
11%
The resolution source for this market is Ornnai.com (ornnai.com), specifically, the H200 Index chart data available at https://dashboard.ornnai.com. The daily values shown on the chart will be used for resolution. Daily data will be considered finalized once the following day’s data point is published.
This market will resolve as soon as the listed price is hit, or once the value for the specified end date is finalized. If not all relevant data has been finalized by the end of the 14th calendar date afterward (ET), this market will resolve based on the data available at that time.
Revisions made to previously published data points, before all relevant data points have been finalized, will be considered; however, they will not disqualify a previously published data point from resolving this market. Revisions made after all relevant data points have been finalized will not be considered.
Pasar Dibuka: Jul 10, 2026, 6:34 PM ET
Resolver
0x65070BE91...The resolution source for this market is Ornnai.com (ornnai.com), specifically, the H200 Index chart data available at https://dashboard.ornnai.com. The daily values shown on the chart will be used for resolution. Daily data will be considered finalized once the following day’s data point is published.
This market will resolve as soon as the listed price is hit, or once the value for the specified end date is finalized. If not all relevant data has been finalized by the end of the 14th calendar date afterward (ET), this market will resolve based on the data available at that time.
Revisions made to previously published data points, before all relevant data points have been finalized, will be considered; however, they will not disqualify a previously published data point from resolving this market. Revisions made after all relevant data points have been finalized will not be considered.
Resolver
0x65070BE91...**H200 rental prices currently show median on-demand rates near $4.47 per GPU-hour across dozens of providers, with verified lows around $2.00–$3.00 on marketplaces like Vast.ai and spot options significantly cheaper.** This reflects sustained demand for the Hopper GPU’s 141 GB HBM3e memory and 4.8 TB/s bandwidth, which suits memory-bound LLM inference and training workloads better than the prior H100 generation. Supply remains constrained relative to hyperscaler and neocloud demand, though NVIDIA is shifting production emphasis toward Blackwell (B200/GB200) chips that now account for the majority of high-end shipments. Limited H200 exports to China and competition from newer platforms with native FP4 support and higher throughput create upward pressure on H200 utilization but also set the stage for potential softening later in 2026 as Blackwell capacity scales. Key near-term catalysts include further Blackwell ramp data, enterprise contract renewals, and any shifts in data-center power availability or export policy.
Ringkasan eksperimental yang dihasilkan AI dengan referensi data Polymarket. Ini bukan saran trading dan tidak berperan dalam bagaimana pasar ini diselesaikan. · Diperbarui
Hati-hati dengan link eksternal.
Hati-hati dengan link eksternal.
Pertanyaan yang Sering Diajukan