**H100 rental prices in 2026 have stabilized and shown modest upward pressure amid sustained AI demand and tighter supply of newer Blackwell GPUs.** As of mid-to-late September 2026, on-demand rates typically range from roughly $1.30–$3.50 per GPU-hour on neoclouds and marketplaces (medians around $3.36), with hyperscalers charging $6–12+, spot/interruptible options lower. Prices bottomed near $1.70 for one-year contracts in late 2025 before rising about 40% by March 2026 and posting further 7–12% gains recently, driven by HBM3e memory constraints, long Blackwell lead times (often 9–12+ months), and broad demand from hyperscalers, enterprises, and sovereign AI initiatives. NVIDIA’s strong order backlog and CEO comments on doubling chip volumes next year underscore the tightness, with Blackwell B200 availability still limited and priced at a premium (medians near $6.50). This dynamic has kept H100 capacity competitive rather than obsolete, with key catalysts including ongoing HBM supply trends, provider capacity releases, and hyperscaler capex updates through year-end.
Résumé expérimental généré par IA à partir des données Polymarket. Ceci n'est pas un conseil de trading et ne joue aucun rôle dans la résolution de ce marché. · Mis à jour$10,275 Vol.
↑ 3,50 $
79%
↓ 2,25 $
42%
↓ 2,00 $
44%
↓ 1,50 $
28%
$10,275 Vol.
↑ 3,50 $
79%
↓ 2,25 $
42%
↓ 2,00 $
44%
↓ 1,50 $
28%
The resolution source for this market is Ornnai.com (ornnai.com), specifically, the H100 Index chart data available at https://dashboard.ornnai.com. The daily values shown on the chart will be used for resolution. Daily data will be considered finalized once the following day’s data point is published.
This market will resolve as soon as the listed price is hit, or once the value for the specified end date is finalized. If not all relevant data has been finalized by the end of the 14th calendar date afterward (ET), this market will resolve based on the data available at that time.
Revisions made to previously published data points, before all relevant data points have been finalized, will be considered; however, they will not disqualify a previously published data point from resolving this market. Revisions made after all relevant data points have been finalized will not be considered.
Marché ouvert : Jul 10, 2026, 10:21 AM ET
Résolveur
0x65070BE91...The resolution source for this market is Ornnai.com (ornnai.com), specifically, the H100 Index chart data available at https://dashboard.ornnai.com. The daily values shown on the chart will be used for resolution. Daily data will be considered finalized once the following day’s data point is published.
This market will resolve as soon as the listed price is hit, or once the value for the specified end date is finalized. If not all relevant data has been finalized by the end of the 14th calendar date afterward (ET), this market will resolve based on the data available at that time.
Revisions made to previously published data points, before all relevant data points have been finalized, will be considered; however, they will not disqualify a previously published data point from resolving this market. Revisions made after all relevant data points have been finalized will not be considered.
Résolveur
0x65070BE91...**H100 rental prices in 2026 have stabilized and shown modest upward pressure amid sustained AI demand and tighter supply of newer Blackwell GPUs.** As of mid-to-late September 2026, on-demand rates typically range from roughly $1.30–$3.50 per GPU-hour on neoclouds and marketplaces (medians around $3.36), with hyperscalers charging $6–12+, spot/interruptible options lower. Prices bottomed near $1.70 for one-year contracts in late 2025 before rising about 40% by March 2026 and posting further 7–12% gains recently, driven by HBM3e memory constraints, long Blackwell lead times (often 9–12+ months), and broad demand from hyperscalers, enterprises, and sovereign AI initiatives. NVIDIA’s strong order backlog and CEO comments on doubling chip volumes next year underscore the tightness, with Blackwell B200 availability still limited and priced at a premium (medians near $6.50). This dynamic has kept H100 capacity competitive rather than obsolete, with key catalysts including ongoing HBM supply trends, provider capacity releases, and hyperscaler capex updates through year-end.
Résumé expérimental généré par IA à partir des données Polymarket. Ceci n'est pas un conseil de trading et ne joue aucun rôle dans la résolution de ce marché. · Mis à jour

Méfiez-vous des liens externes.
Méfiez-vous des liens externes.
Questions fréquentes