Skip to main content

US-এ ট্রেড করতে polymarket.us-এ যান

icon for Will there be a power grid emergency before October 1?

Will there be a power grid emergency before October 1?

icon for Will there be a power grid emergency before October 1?

Will there be a power grid emergency before October 1?

$24,031 Vol.

Oct 2, 2026
Polymarket

$24,031 Vol.

Polymarket

California (CAISO)

$3,356 Vol.

3%

Texas (ERCOT)

$2,282 Vol.

6%

Central US (SPP)

$945 Vol.

39%

Mid-Atlantic (PJM)

$1,762 Vol.

1%

New York (NYISO)

$1,890 Vol.

6%

New England (ISO-NE)

$802 Vol.

3%

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".Rising electricity demand from data centers and manufacturing, combined with variable renewable output and aging generation, continues to pressure U.S. grid margins into early fall, though peak summer heat has moderated. NERC’s 2026 Summer Reliability Assessment notes record resource additions exceeding 58 GW, primarily solar, battery, and natural gas, which have improved reserve margins under normal conditions. EIA’s September 9 forecast projects record 2026 generation to meet 2% demand growth, while recent DOE emergency orders for heat-related alerts in regions like SPP and PJM highlight how temperature-driven load spikes can trigger Energy Emergency Alerts. Late-September weather patterns, generator forced outage rates around 9%, and any unexpected maintenance or early cold fronts remain key variables monitored by grid operators through October.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".
ভলিউম
$24,031
শেষ তারিখ
Oct 2, 2026
মার্কেট ওপেন হয়েছে
Aug 12, 2026, 5:25 PM ET

রেজলভার

0x65070BE91...
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Electric Reliability Council of Texas (ERCOT) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM CT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ERCOT communication — its news releases (https://www.ercot.com/news/releases), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Southwest Power Pool (SPP) — the regional transmission organization serving all or part of 17 states across the central and western U.S. — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Central US" in the title is a general label — only an SPP declaration counts, and emergencies in other central-U.S. grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official SPP communication — its press releases (https://www.spp.org/newsroom/press-releases/), Grid Notices, or its real-time Current Grid Conditions page — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if PJM Interconnection declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) anywhere across its footprint from this market's creation through 11:59 PM ET on September 30, 2026. PJM serves all or part of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia, and the District of Columbia; a qualifying declaration anywhere in that footprint counts, and "Mid-Atlantic" in the title is only a general label. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official PJM communication — its Inside Lines blog (https://insidelines.pjm.com/), emergency-procedure or market messages, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the New York Independent System Operator (NYISO) declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official NYISO communication — its News & Media page (https://www.nyiso.com/news-and-media), market notices, or real-time system-conditions postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".This market resolves "Yes" if the Midcontinent Independent System Operator (MISO) — the regional transmission organization serving all or part of 15 U.S. states from the Great Lakes to the Gulf Coast — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) for any of its balancing authority areas from this market's creation through 11:59 PM CT on September 30, 2026. "Midwest" in the title is a general label — only a MISO declaration counts, and emergencies in other grid operators do not qualify. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official MISO communication — its Media Center (https://www.misoenergy.org/meet-miso/media-center/), market notices, or real-time grid-condition postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".Rising electricity demand from data centers and manufacturing, combined with variable renewable output and aging generation, continues to pressure U.S. grid margins into early fall, though peak summer heat has moderated. NERC’s 2026 Summer Reliability Assessment notes record resource additions exceeding 58 GW, primarily solar, battery, and natural gas, which have improved reserve margins under normal conditions. EIA’s September 9 forecast projects record 2026 generation to meet 2% demand growth, while recent DOE emergency orders for heat-related alerts in regions like SPP and PJM highlight how temperature-driven load spikes can trigger Energy Emergency Alerts. Late-September weather patterns, generator forced outage rates around 9%, and any unexpected maintenance or early cold fronts remain key variables monitored by grid operators through October.

This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026.

A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it.

The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward.

Otherwise, this market resolves "No".
This market resolves "Yes" if the California Independent System Operator (CAISO), which operates the electric grid serving most of California, declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM PT on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official CAISO communication — its newsroom (https://www.caiso.com/about/news), market notices, or real-time system-condition (Today's Outlook) postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".
ভলিউম
$24,031
শেষ তারিখ
Oct 2, 2026
মার্কেট ওপেন হয়েছে
Aug 12, 2026, 5:25 PM ET

রেজলভার

0x65070BE91...

বাহ্যিক লিংক থেকে সাবধান।

সচরাচর জিজ্ঞাসা

"Will there be a power grid emergency before October 1?" হলো Polymarket-এ 7 সম্ভাব্য ফলাফলসহ একটি প্রেডিকশন মার্কেট যেখানে ট্রেডাররা কী ঘটবে বলে বিশ্বাস করে তার ভিত্তিতে শেয়ার কেনাবেচা করে। বর্তমান শীর্ষ ফলাফল "Midwest (MISO)" 100%-এ, তারপর "Central US (SPP)" 39%-এ। দাম রিয়েল-টাইম ক্রাউড-সোর্সড সম্ভাবনা প্রতিফলিত করে। মার্কেট রেজোলিউশনে সঠিক ফলাফলের শেয়ার প্রতিটি $1-এ রিডিমযোগ্য।

আজ পর্যন্ত, "Will there be a power grid emergency before October 1?" মোট $24K ট্রেডিং ভলিউম তৈরি করেছে মার্কেট Aug 12, 2026-এ লঞ্চ হওয়ার পর থেকে। এই স্তরের ট্রেডিং অ্যাক্টিভিটি Polymarket কমিউনিটির শক্তিশালী এনগেজমেন্ট প্রতিফলিত করে এবং নিশ্চিত করতে সাহায্য করে যে বর্তমান অডস মার্কেট অংশগ্রহণকারীদের একটি গভীর পুল দ্বারা অবহিত। আপনি এই পেজে সরাসরি লাইভ মূল্য মুভমেন্ট ট্র্যাক করতে ও যেকোনো ফলাফলে ট্রেড করতে পারেন।

"Will there be a power grid emergency before October 1?"-এ ট্রেড করতে, এই পেজে তালিকাভুক্ত 7 উপলব্ধ ফলাফল ব্রাউজ করুন। প্রতিটি ফলাফল মার্কেটের ইম্প্লায়েড প্রবাবিলিটি প্রতিনিধিত্ব করে একটি বর্তমান দাম দেখায়। পজিশন নিতে, আপনি যে ফলাফলকে সবচেয়ে সম্ভাবনাময় মনে করেন সেটি নির্বাচন করুন, এর পক্ষে "Yes" বা বিপক্ষে "No" বেছে নিন, আপনার পরিমাণ লিখুন এবং "Trade" ক্লিক করুন। মার্কেট রেজলভ হলে আপনার নির্বাচিত ফলাফল সঠিক হলে, আপনার "Yes" শেয়ার প্রতিটি $1 দেয়। ভুল হলে, $0 দেয়।

"Will there be a power grid emergency before October 1?"-এর বর্তমান ফ্রন্টরানার "Midwest (MISO)" 100%-এ, মানে মার্কেট সেই ফলাফলে 100% সম্ভাবনা নির্ধারণ করে। পরবর্তী নিকটতম ফলাফল "Central US (SPP)" 39%-এ। এই অডস রিয়েল-টাইমে আপডেট হয়।

"Will there be a power grid emergency before October 1?"-এর রেজোলিউশন নিয়ম সঠিকভাবে সংজ্ঞায়িত করে প্রতিটি ফলাফলকে বিজয়ী ঘোষণা করতে কী ঘটতে হবে — ফলাফল নির্ধারণে ব্যবহৃত অফিসিয়াল ডেটা সোর্স সহ। আপনি এই পেজের মন্তব্যের উপরে "Rules" সেকশনে সম্পূর্ণ রেজোলিউশন মানদণ্ড রিভিউ করতে পারেন।